Free Asbestos Register Template (UK): Duty to Manage, PDF & Excel
The register records what is there. The management plan records what you are doing about it. Regulation 4 requires both.
The duty to manage asbestos is failed far more often through a stale register than a missing one. A survey done in 2014, filed and never revisited, tells a contractor drilling a wall in 2026 nothing useful about the condition of what is behind it. Regulation 4 requires the assessment to be reviewed and the condition monitored, which is why this template pairs the register with a management plan and a reinspection date on every line.
↓ Download PDF (print-ready)↓ Download Excel (editable)
Free for use within your organisation. No sign-up required. If it saves you time, a link back to this page is always appreciated.
Tell me when the rules behind this template change (free, one email when it happens, nothing else).
What the law requires
Regulation 4 of the Control of Asbestos Regulations 2012 places the duty to manage asbestos on the dutyholder for non-domestic premises. The dutyholder is whoever has the obligation for the repair and maintenance of the premises under a contract or tenancy, and where there is no such contract or tenancy, anyone who has control of the premises to any extent.
The duty requires a suitable and sufficient assessment of whether asbestos is or is liable to be present, a record of its location and condition, and a written plan identifying the parts of the premises concerned and the measures for managing the risk. Note the phrase "liable to be present": where you have not established otherwise, materials in a building of the relevant age must be presumed to contain asbestos and managed accordingly.
What's in the template
- Asbestos register: reference, location, material or product type, extent, whether presumed or confirmed, condition, risk assessment score, action and reinspection due date
- Management plan: the control measures and actions with an owner, target date, completion, confirmation that contractors were informed, and the review record
How to use it
Give every entry a reference and use it consistently across the register, the plan, the survey report and any labels on site. Record whether each item is confirmed by sampling or presumed, because that distinction changes what a contractor is allowed to do near it.
Set a reinspection date on every line, typically annually, and diarise it. Condition is the variable that changes: asbestos insulating board that was sealed and in good condition can be damaged by an unrelated leak, and nobody will tell you unless someone is looking.
Then close the loop that actually prevents exposure: show the register to every contractor before work starts and record that you did. The management plan has a column for it. Most asbestos disturbances in occupied buildings happen because a contractor was never shown a register that existed. Related: asbestos records on construction sites and the CDM pre-construction information pack.
Who must keep this record
The dutyholder, as defined above. In a let commercial building the repairing obligations in the lease normally decide who that is, and it is worth checking rather than assuming: on a full repairing and insuring lease the duty can sit with the tenant. Where obligations are split, more than one party can hold the duty, and they are required to cooperate.
The duty applies to non-domestic premises, which includes the common parts of residential blocks. The flats themselves are outside it, but the corridors, plant rooms, risers and roof spaces of the same building are not.
How long to keep it
Keep the register and plan for the life of the building, updated on every reinspection and after any removal or remedial work. Retain superseded versions rather than overwriting: the history of what was found, where, and what was done about it is what protects you, and asbestos-related claims can arise decades after the exposure.