Free Signing In Sheet Template (UK): Staff and Contractor Sign In and Out, Word, Excel and PDF
A daily signing in and out sheet for staff and contractors, built for fire roll calls and UK GDPR.
A signing in sheet answers one question in an emergency: who is in the building right now? It is also your record of which contractors were on site, when, and whether they were told the site rules. This daily sheet covers staff and contractors, with time in, time out, area of work and an induction column. For members of the public and one-off visitors, use the visitor logbook template, which is designed so visitors cannot read each other's details.
Free to use and adapt within your organisation. No sign-up, no watermark.
What is in the template
- 16 lines per sheet, one sheet per day
- Time in and time out, the two columns a roll call depends on
- Area of work and vehicle registration
- Site rules or induction column, initialled by the host
- End-of-day check: has everyone signed out
- Retention line for you to complete, so the sheet tells people how long you keep it
How to fill it in
- Put the sheet where people actually enter, with a pen that works.
- Fill in the retention period at the top and make your privacy notice available.
- Brief contractors on site rules (fire alarm, assembly point, permits, asbestos register) and initial the last column.
- Take the sheet to the assembly point in an evacuation. Nominate who grabs it.
- Check sign-outs at the end of the day and follow up gaps.
- File, then destroy on schedule.
Worked example
An illustrative entry, to show the level of detail an inspector or insurer expects. The download includes this example on its own page.
| Name (print) | Company | Visiting / working in (area) | Vehicle reg | Time in | Signature | Time out | Site rules / induction given (initials) |
|---|---|---|---|---|---|---|---|
| P. Ahmed | Northside Electrical Ltd | Plant room, level 2 | KX24 ABC | 07:55 | Signed | 15:40 | JD |
| L. Brown | Staff | Warehouse | 08:00 | Signed | 16:30 |
The legal basis
No regulation requires a signing in sheet by name. It supports duties that do exist. The Regulatory Reform (Fire Safety) Order 2005 requires procedures for evacuation, and you cannot account for people you have no record of. Employers and those in control of premises owe duties to non-employees under section 3 of the Health and Safety at Work etc. Act 1974, and under the Control of Asbestos Regulations 2012 anyone liable to disturb asbestos must be given information about its location, which the induction column evidences. On construction sites, CDM 2015 requires the principal contractor to prevent unauthorised access.
The names, companies and vehicle registrations on the sheet are personal data. Under UK GDPR you need a lawful basis (legitimate interests is the usual one), must tell people what you do with the data, must collect no more than you need and must not keep it longer than necessary. No retention period is prescribed: decide one, write it on the sheet and follow it. Many organisations keep sheets for between one and twelve months unless an incident means a particular sheet is needed for longer.
Common mistakes
- Nobody signs out. A sheet full of open entries is useless at roll call.
- Leaving the sheet in a burning building. Assign a named person to bring it out.
- Collecting data you do not use, such as home addresses or mobile numbers.
- Keeping sheets for years with no reason. Indefinite retention breaches the storage limitation principle.
FAQs
Is a signing in sheet a legal requirement?
Not by name. It is a practical way to meet fire evacuation and contractor control duties, and most insurers and auditors expect one.
Is a signing in sheet GDPR compliant?
It can be. Have a lawful basis, tell people why you collect the data, collect only what you need, stop others from browsing it where you can, and set and follow a retention period.
How long should signing in sheets be kept?
There is no statutory period. Choose one that fits the purpose, commonly between one and twelve months, and keep sheets linked to an incident or claim for longer.
Should staff sign in as well as visitors?
If you have no other reliable record of who is on site, such as access control or a rota, yes. For fire roll call you need to account for everyone.